From: route@monster.com
Sent: Saturday, April 16, 2016 2:06 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Jarrod
Richardson PO Box 1182 Harrison, AR 72602 870.204.4682
JarrodRichardson@msn.com ObjectiveI am looking to find a more secure and
rewarding career, where my skills are tested
and rewarded and as a team we achieve our goals. ExperienceField Operations Manager T-Mobile RA project
August
2014- Present Nokia-Siemens
Network ·
As FM I am
responsible for the daily management of all field operations
including the night cutover bridge. I also host or attend
project meetings at the market level covering all areas from quality,
progress, logistics and site issues. I am responsible to evaluate and train
the GC field staff and personnel by site visits and meetings. I also handle
CM duties associated with BTS builds, upgrades and maintenance. I demonstrate
well the ability to think critically through a process, anticipate challenges
and prepare for solutions in advance .I also work closely with my team to
identify inefficient processes and make changes when needed for improvement.
My position also requires me to assist with BOM ordering and oversee the
receipt of equipment and distribution of materials and local inventory per
the market I work closely with the Program manager and Directors to ensure
timely delivery of sites and maintain accurate milestone forecasting and
actuals. AAV Coordinator CM/
Backhaul Project Mg August
2012-December 2013 Ericsson Alabama
and MS/LA markets ·
As an AAV
Coordinator my duties ranged from engaging different AAV’s in the market and
setting up and maintain a professional relationship for the building and
delivery of Backhaul to the cell sites from the PROW. I was responsible
for site modifications as needed. I performed site walks, site meetings,
completed site plans or Construction Drawings per the information captured
and relayed this to all pertinent personnel. Perform daily business antenna
& Line installations, lead all areas of cellular site construction.
Ensured quality and safety control guidelines were met at all times,
scheduled all permitting and inspections as required by local municipalities.
Completed bid walks, RFQ’s, estimates, and material orders. Provided closeout
pkgs for each site upon construction completion and acted as company safety
representative and liaison for customers and vendors. ·
I was
involved in Site Acquisition and Site Developmental meetings and customer
focus groups. §
Handle the day to day operations of numerous clients ‘jobs
and schedule labor for upcoming projects. §
Lead team building conferences and/or perform job training
for possible new hires, vendors, and subcontractors. Construction Manager/Project
Mgr. August 2010-August
2012 On Point Tech
Solutions Harrison AR ·
Manage
Projects awarded to company and perform customer services and oversee site
modifications as needed. Perform
daily business antenna & Line installations, lead all areas of cellular
site construction. Ensured quality and safety control guidelines were met at
all times, scheduled all permitting and inspections as required by local
municipalities. Completed bid walks, RFQ’s, estimates, and material orders.
Provided closeout pkgs for each site upon construction completion and acted
as company safety representative and liaison for customers and vendors. ·
Working
towards PMP certification §
Handle the day to day operations of numerous clients ‘jobs
and schedule labor for upcoming projects. §
Lead team building conferences and/or perform job training
for possible new hires, vendors, and subcontractors. Program/Project Manager/Installations
Trainer February 2006-December 2009 Advanced Communications Services INC Harrison, AR §
Maintained positive customer relations daily, in order for
business to survive and grow, performed daily conference calls with customer
and vendors, researched inventory pricing and logistics and RFP’s, held
training meetings for management staff, scheduled team building events for
vendors, subs, and managers in order to ease and grow their working
relationships. Attended training seminars towards completing a PMP
curriculum. §
Lead installations and train new crews to our customer’s
quality and installations practices and insured safety awareness. §
Evaluate performances and make necessary adjustments in
crews as needed. Project
Manager/Tester/Lead Installer May 2002 - December 2005 Advanced Communications LLC Harrison AR §
Helped company providing Installation and Consulting for
IT related projects. §
Installed and led teams of installers in many different
types of environments, some examples are SBC central offices, RBOC,
BTS, BSC, PBX buildings, Bank of Americas, Hospitals, and Colleges across the
nation, Movie Theaters and Restaurants and Corporate HQ’s, training centers
and NOC’s in the lower 48 states. §
Worked with cutting edge DCCS equipment as well as
Switches, routers, all types of computer peripherals and Major AV suppliers,
LCD, and Plasma screens, Fiber, copper and coaxial and electrical cabling. Project
Manager/Lead Installer/ Detail Engineer/Tester January 2000-May 2002 Telamon of Arkansas Conway AR §
Started out as Lead Installer/Tester of Telecommunications
equipment for Telamon. Job duties included filling out all paperwork
associated with SBC installations including but not limited to; JSA’s Job
Completion Reports, Job Information Memorandums, Hazardous Materials
disposal, and all Engineering changes on site and to record these for later
installations in the Job Specifications booklet and final drafts. I completed
daily work progress reports on the jobs I installed and the ones I was
overseeing. §
As my tenure with the company grew I was advanced to
Project Manager and finally Detail Engineer. As a DE some of my duties
were to perform onsite job meetings with customer representatives to discuss
their needs and expectations, also to gather certain information specific to
the upcoming projects such as building codes and what network structures were
in place on site and what we needed to incorporate for a final working
system. I was responsible for the quality of installations and costs of the
job and overall profit as well. I have other installation experience from
various telecommunications companies also, if needed I can supply work
history in the IT field dating back to 1996 which includes some of the
following: 15+ years of Construction
Management and Operations Management for multiple telecom projects in
wireless, central office and outside plant 15+ years of RBOC, BTS and
BSC operations management experience. Site surveys for upgrades,
equipment ordering, and staffing requirements Fiber
Optic, Copper, and CATV installations, repairs, and replacements Safety
director with OSHA training and qualifications Leading teams of 5-80
field technicians EducationHarrison
High School,
Harrison AR Diploma North Arkansas College Harrison AR Basics no degree Arkansas Tech University Russellville AR Basics no degree Spencer Technical Ashland KY Telecommunications Installer Level I and II Nortel Networks Dallas TX Switch Basic Intro and Equipment
Diagnostics Alcatel INC Plano TX DCCS overview and orientation for SMC and
LMC Fiber Ring I&R Cisco Switch and Router Preface and
Diagnostics Ciena Testing Class Microsoft Suite Certification Ericsson field Tech and CM I, II, III
training and test NSN Installation and Commissioning and
Integrations on Flexi BTS and LA700 PMI/PMP Certification pending test ReferencesReferences
are available on request. Jarrod Richardson PO Box
1182 Harrison, AR 72602 870.204.4682 Email JarrodRichardson@msn.com |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|